York Hot Tap Feed - Detailed Design

York is one of the largest undeveloped gas fields in the Southern North Sea. The clients requirements were for Pre-FEED and FEED studies to confirm the viability of performing a mechanical hot tap into the BP SNSPS pipeline as the basis for connection of the York export pipeline.

Ormen Lange Hot Taps - Project Support

The Ormen Lange Field is located in 850m of water in the Norwegian sector of the North Sea. The client required project and operational support for two subsea hot taps into the Ormen Lange export pipelines.

Hoton Pipeline - Conceptual/Detailed Design

The Hoton field is located in the Southern sector of the North Sea, the client required a concept screening study to determine optimal sizing and routing of a gas export pipeline and detailed design of a riser system to support gas production from a second Hoton well.

Broom Pipeline Recovery - Operational Support

The Broom field is located in the East Shetland basin approximately 7km SW of the Heather platform in 140m of water. Following failure of the P1 pipeline the client required operational support to determine failure mode preliminary costing for a replacement pipeline.

Dunbar Replacement Pipeline - Operational Support

The Dunbar coaxial pipeline conveys multiphase production fluids from the Dunbar platform to the Alwyn platform. The clients requirement was for project engineering and personnel to support installation of a replacement pipeline within a 15 month deadline.

Informed Subsea Design